凝汽器换管-胶球清洗装置-二次滤网_连灵动

Deaerator type
Your location : Home > Product > Deaerator type
Continuous Blowdown Expander Continuous Blowdown Expander
Continuous Blowdown Expander Continuous Blowdown Expander
Continuous Blowdown Expander Continuous Blowdown Expander
Continuous Blowdown Expander Continuous Blowdown Expander

Continuous Blowdown Expander Continuous Blowdown Expander

Continuous blow down flash tank, also known as continuous blow down expansion tank, is connected to the continuous discharge outlet of the boiler and is used to reduce pressure and expand the capacity of the boiler.
Online inquiry
下一產(chǎn)品 : Headless deaerator
  • Content details

Overview of continuous discharge expansion vessel, continuous discharge expander, and expansion vessel:


A continuous blow down flash tank, also known as a continuous blow down expansion tank, is connected to the continuous discharge outlet of a boiler and is used to reduce the pressure and expand the continuous discharge of the boiler. The discharged sewage is separated into secondary steam and waste hot water through thermal expansion in the continuous blow down expansion tank, and then expanded, depressurized, and expanded in the expansion tank Heat exchange is carried out and then discharged. The secondary steam is led out through the pipeline of the valve, and the waste hot water is automatically discharged through the float level valve or overflow control valve. The heat energy can be recovered and reused. The continuous discharge volume automatically adjusts with the change of boiler feedwater load, maintaining a relatively stable discharge rate. So utilizing secondary steam and waste hot water as heat can recover some of the heat lost from continuous boiler discharge and improve boiler efficiency.


Continuous discharge expansion vessel, continuous discharge expander, purpose of expansion vessel:


The function of a continuous sewage expander is to expand and evaporate the boiler's sewage, and separate the steam from the sewage. The separated steam can be recovered to the thermal system (such as leading the steam to the deaerator); Unevaporated sewage can be sent to the sewage cooler to heat softened water, etc. From this, it can be seen that a continuous sewage expander is a treatment equipment that effectively utilizes the heat energy contained in boiler wastewater.


Continuous discharge expansion vessel, continuous discharge expander, expansion vessel boiler auxiliary equipment electrical equipment, so secondary steam and waste hot water can be used as heat to recover some of the heat lost by continuous discharge of the boiler and improve boiler efficiency.


Continuous discharge expansion vessel, continuous discharge expander, expansion vessel safety accessories:


1. The equipment is equipped with safety valves, pressure gauges, and liquid level gauges as safety accessories, which should comply with relevant regulations during use.


2. The opening pressure of the safety valve should be 0.61Mpa.


3. The pressure gauge should be calibrated and qualified before use.


Continuous discharge expansion vessel, continuous discharge expander, use and management of expansion vessel:


The use and management of this equipment shall comply with the relevant provisions of the Pressure Vessel Safety Supervision Regulations.


Continuous discharge expansion vessel, continuous discharge expander, maintenance of expansion vessel:


1. The maintenance of this equipment should comply with the relevant provisions of the Pressure Vessel Safety Supervision Regulations;


2. When repairing the regulating valve, the rear valve should be closed to detach it from the system;


3. Repair should be carried out under pressure.


Continuous discharge expander, continuous discharge expander, and operating precautions for expander:


1. When the boiler requires a large amount of discharge, or when the liquid level control valve fails, the bypass valve should be opened to increase the discharge.


2. The opening of the partial exhaust valve should be adjusted to maintain the working pressure inside the continuous exhaust.


3. Adjust the opening of the liquid level control valve to ensure that the water level of the continuous discharge is at the intermediate position of the water level gauge.


4. The working pressure of the safety valve must be set according to regulations.


5. This equipment can supply sewage from two boilers at the same time. If only one boiler is supplied, a flange cover should be added to the inlet flange of the other boiler.


Continuous discharge expansion vessel, continuous discharge expander, working principle of expansion vessel:


The continuous discharge of sewage from the boiler is saturated water under the working pressure of the boiler, with high temperature and high enthalpy value. If the pressure is lowered, the vaporization of water will decrease, causing the original saturation state to be disrupted. Some water will release overheated heat to become saturated water under pressure, while others will absorb the latent heat of evaporation and become steam. This type of evaporation is called flash evaporation.


The continuous discharge expander utilizes the principle of flash evaporation to obtain secondary steam. The boiler wastewater with fixed parameters is then fed into the expander with a volume several times larger than the pipeline, causing a decrease in pressure and an increase in volume, resulting in flash evaporation of steam. At the same time, the continuous sewage expander relies on ion separation, force separation, and molecular friction separation to separate gas and water, thereby obtaining low salt content secondary steam. The discharged sewage enters the expander from the tangential pipe, causing the fluid to rotate, and the generated steam rises along the expander. After passing through the space, it is separated by the louver steam water separation device, thus completing the entire separation process of steam and water.


The boiler wastewater is continuously and uniformly connected to the blow down flash tank. The wastewater moves tangential in the cylindrical partition of the outer shell and immediately vaporizes into secondary steam. It passes through the upper hundred leaf window type steam water separator for steam water separation, and then enters the outlet of the continuous discharge section for deoxygenation


The remaining sewage is discharged through the water level control valve.


Continuous sewage expansion vessel, continuous sewage expansion device, expansion device structure and main specifications:


The continuous sewage expander consists of a main body, piping system, and accessories. The main body of the continuous sewage expander is composed of a cylindrical shell and an internal device. The internal devices include partitions, louvers for steam and water separators, and floating balls for controlling control valves. For ease of repair, flange connected shells or manholes can be installed on the shells. The types of continuous sewage expanders are divided into vertical and hanging types: the support of the vertical expander can be placed on the ground at the bottom, and the support of the hanging expander can be placed on the platform at the waist. In addition, external accessories such as safety valves, pressure gauges, water level control valves, and liquid level gauges are installed. The main specifications of the continuous sewage expander are: design pressure: 1.4MPa, design temperature: 350 ℃, full volume: 3.5m3. The pipeline system adopts a bypass structure, which is convenient for emergency use when the regulating valve fails or when a large amount of sewage is discharged.


Continuous discharge expansion vessel, continuous discharge expander, installation requirements for expansion vessel:


1. Equipment installation - must comply with the relevant provisions of the Pressure Vessel Safety Supervision Regulations.


2. The installation and use unit shall, in conjunction with the installation and construction unit, clean and inspect the random documents and equipment. Any deformation or damage that may occur during transportation, which is critical to normal use and safety, must be repaired before installation and use.


3. When the technical information such as production qualification, installation and use instructions, and general drawings are not complete, installation and use are not allowed.


4. Install the equipment in place on the support foundation and align it in position.


5. Open the manhole and inspection hole, and dismantle the container flange (equipment connected to the container flange), clean and inspect the inside of the cylinder, ensure that the liquid level gauge interface is unobstructed, and install internal devices before closing the lid.


6. For equipment connected by container flanges, the connecting bolts of the container flange should be evenly stressed.


7. Connect the equipment piping system according to the drawings, and the piping system shall not bear external loads.


8. Install the regulating valve transmission device according to the drawing requirements, ensuring that the adjustment and transmission are positive.


9. After installation, close each pipe hole and conduct a water pressure test according to the drawing requirements. The water pressure test should comply with the Safety Supervision Regulations for Pressure Vessels.


10. After the installation is completed, the construction unit should transfer the technical data, installation specifications, and installation measurement data to the using unit. The using unit should invite the local labor department to inspect the equipment itself and installation, and only after confirming that it is qualified can it be put into use.


Continuous discharge expansion vessel, continuous discharge expander, expansion vessel - different specifications can be arranged according to user needs for separate design schemes! Interested parties contact us!


Continuous discharge expansion vessel, continuous discharge expander, technical parameters of expansion vessel:


[Production Model]: [LP-0.8~5.5B] - [Volume m] 3 0.8~5.5] - (Working pressure MPa0.69~0.785) - (Working parameters ℃ 170~350)


Continuous discharge expansion vessel, continuous discharge expander, and expansion vessel ordering instructions:


1. The number and volume of continuous expansion devices are selected based on the number of boilers and the discharge rate.


When the number of boilers is relatively high, the number of continuous row expanders can be increased.


3. The continuous sewage from the boiler is throttled and sent to the sewage expansion vessel for expansion and evaporation. The expanded steam is recovered to the thermal system.


In order to stabilize the pressure, steam is usually directed to the deaerator..


5. Generally, 2-4 boilers are considered to be equipped with one continuous expansion vessel, but not limited to this regulation. The selection should be based on the production specifications of the continuous expansion vessel and the specific situation of the project.


Lisheng Company is committed to improving the safety, efficiency, and stability of continuous sewage expansion tanks, continuously improving and innovating production technology, creating unique designs that seamlessly integrate with architecture.


Continuous discharge expansion vessel, continuous discharge expander, main models of expansion vessels include: LP-0.8, LP-1.5, LP-3.0, LP-3.5, LP-4.0, LP-5.5, LP7.0, etc.


Series and main technical parameters of continuous discharge expansion vessel, continuous discharge expansion device, and expansion device:



型號(hào)工作壓力MPa設(shè)計(jì)壓力MPa設(shè)計(jì)溫度℃工作溫度℃容積m3備注
LP-0.80.69

1700.8
LP-1.50.17

1701.5
LP-1.5Z0.1960.245
1701.5自調(diào)式
LP-1.5l1.7850.8643503501.5--
LP-1.5ll0.2940.3233002501.5二-
LP-3B0.700.982001703.0高壓
LP-3.50.69

1703.5
LP-3.5l0.600.693503503.5高溫
LP-3.5B0.880.982001703.5高壓
LP-40.2
3002604.0
LP-5.50.69

1705.5
LP-5.5B0.7850.92001705.5高壓


產(chǎn)品動(dòng)態(tài)

Continuous Blowdown Expander Continuous Blowdown Expander生產(chǎn)廠家Copyright ? 2012-2023 Lianyungang Lingdong Electromechanical Equipment Co., Ltd all rights reserved

Tel

0518-85370171

主站蜘蛛池模板: 烟台金润核电材料股份有限公司| 西安测试仪-西安电压测试仪-西安电流测试仪-西安热油汽水测试仪-西安阻抗测试仪-西安时间速度测试仪-西安电力设备厂家-西安中洲电力设备有限公司 | 芜湖禾风机械设备有限公司[官网]| 尾矿干排_机制砂尾矿干排_带式压滤机|山东森鹏环保科技有限公司 潍坊卓瑞机械有限公司,输送设备,石灰消化设备,餐厨垃圾设备,化机浆设备,污泥脱水 | 炸鸡汉堡设备厂家-开汉堡炸鸡店需要的设备全套-广州英迪尔电器有限公司 | 太原仪诚实验室设备有限公司| 威学一百-专注国际学校择校备考-DSE-A-level-雅思-托福-OSSD-港澳台联考-AP-IGCSE-IB-AMC-多邻国-PTE-SAT-SSAT-小语种(如日语,韩语,德语,法语,西班牙语,意大利语,俄语,泰语)等考试培训,为出国留学学生提供个性化定制性学习方案,线下实体面授+线上网络课程, 提供一对一,小班课等多种班型 | 锯骨机-砍排机-全自动锯骨机-商用砍排机-切丁机 - 广州市九盈机械设备有限公司 | 微机继电保护测试仪,单相继电保护测试仪,三相继电保护测试仪,六相继电保护测试仪,介质损耗测试仪,氧化锌避雷器测试仪,无线核相仪-扬州豪泰电力科技有限公司 | 箱式电炉,箱式烧结炉,箱式马弗炉,箱式实验炉,高温箱式电阻炉,箱式加热炉,箱式退火炉,箱式真空气氛炉洛阳研博炉业有限公司 | 生活污水处理工程安装承包-江苏富瑞源环境工程有限公司 | 宿迁市华泰交通设施有限公司,上海第四代路名牌,天津仿罗马柱路名牌,标准路名牌,路名牌灯箱,公交站台,户外广告灯箱, 交通标志牌,社区阅报栏 | 首页--南京俊全科技有限公司,环保监测无人机,大疆无人机,农用无人机,植保无人机,巡检无人机,无人机环境监测仪,消防,无人机,航拍测绘,固定翼无人机,无人机电力巡检,四旋翼无人机 | 重大事件回顾:三亚哪里可以打炮?2025年最全实战攻略带你玩转真枪射击 | 泊头市特种油泵阀制造有限公司 - 渣油泵,重油泵,沥青泵,高压齿轮泵,煤焦油泵,导热油泵,三螺杆泵,圆弧齿轮泵,不锈钢齿轮泵, | 商标注册_商标转让交易_专利申请_版权登记_ISO认证服务咨询-世标知识产权 | 潍坊志扬机械有限公司_扫地机-抓蔗机-履带运输机-自上料搅拌车 | 中标通国际认证(深圳)有限公司-知识产权管理体系认证-湖北知识产权贯标 | 商用车之家——观点有态度 热点不缺席 靠谱的商用车门户网站 | 青砖厂家,青瓦价格-河北祥庆烧结瓦有限公司 | 网上配音_免费配音_广告专题配音_网络录音网站【海豚配音】 | 真空泵维修保养-真空泵-真空泵油-真空泵过滤器-真空泵碳片-东莞市海扬真空设备有限公司 | 太阳能路灯-庭院灯-太阳能灯生产厂家-北京日月升太阳能科技公司 太阳能路灯生产厂家-郑州太阳能高杆灯价格-道路照明智能路灯-河南坤德照明 | 欧氏运动木地板,体育木地板厂家,篮球木地板价格_欧氏体育木地板 欧派板材官网 | 全屋定制板材 专业供应商 | 济宁市兴大工程机械有限公司 | 专业色素炭黑生产厂家,提供各种用途色素炭黑价格-枣庄鑫源化工 | 苏州氮气弹簧厂家_江浙沪氮气弹簧价格_江苏氮气弹簧规格_BelleFlex碟形弹簧_昆山三虑五金机械有限公司 | 盘扣租赁|盘扣架租赁|盘扣脚手架|盘扣脚手架租赁|盘扣式脚手架|盘扣式脚手架租赁-北京亚欧盟盘扣租赁有限公司 | 桥梁养护|桥梁维修加固|隧道裂缝修补|支座更换|管道堵水气囊|衡水众拓路桥养护有限公司 | 爬架网@建筑爬架网@冲孔建筑爬架网片@工地冲孔建筑爬架网片@工地冲孔建筑爬架网片厂家@工地冲孔建筑爬架网片生产厂家-安平县诺德金属制品有限公司 | 太阳能路灯生产厂家-郑州太阳能高杆灯价格-道路照明智能路灯-河南坤德照明 | 铅板,防辐射铅板,医用铅板,保定美伦有色金属有限公司 | 均高生物科技(上海)有限公司-二十年专注于均质·乳化·粉碎·分散工艺 | 山东礼品盒,礼品盒生产厂家,礼品包装盒厂家-济南恒印包装有限公司 | 荧光显微镜,倒置显微镜,显微镜相机,荧光光源——广州市明美光电技术有限公司 | 注册公司计|代理记账|临港招商_上海临港商盟官网 | 淘金车,移动式淘金车,大小型旱地采矿车-青州冠诚重工机械有限公司 | 铜陵耐火砖|铜陵耐火浇注料|铜陵耐火材料|铜陵市金钟物资经营部【官网】 | 质检报告_COC_CE认证_LFGB测试_REACH_FCC_FDA-冠通检测 | 免费的动态思维导图软件,脑图大师,思维导图制作软件 - 万彩脑图大师官网 | 山东致合必拓环保科技股份有限公司 |